High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98

Product Details
Customization: Available
After-sales Service: Global After-Sales Service
Warranty: 12 Months After Supply
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW PayPal
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (20)
  • High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
  • High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
  • High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
  • High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
  • High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
  • High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
Find Similar Products
  • Overview
  • Product Parameters
  • Product Description
  • YTS′s Technical Advantages
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
C15-3.43/0.98
Power
15MW
Generator Type
Synchronous Generator
Certification
CCC, ISO, TLC, CE
Standard
Nonstandard
Form
Impulsive
Material
Comply with Standards
Medium
Steam
Adjustment Method
Electro-Hydraulic Regulation
Steam Inlet Pressure
3.43MPa
Steam Inlet Temperature
435ºC
Steam Inlet Flow
101.5t/H
Speed
3000r/Min
Exhaust Pressure
0.007MPa
Transport Package
Sea and Land Transport
Specification
Different power
Trademark
Anhui Zhengyufeng
Origin
Wuhu, Anhui, China
HS Code
840682
Production Capacity
50unit/Year

Packaging & Delivery

Package Size
750.00cm * 497.00cm * 284.00cm
Package Gross Weight
15000.000kg

Product Description

 
Product Parameters
 
Type of steam turbine 15MW Condensing Steam Turbine
Model No. of steam turbine C15-3.43/0.98
Rated power MW 15
Rated speed r/min 3000
Rated steam inlet pressure Mpa 3.43
Rated steam inlet temperature ºC 435
Rated steam inlet flow t/h 101.3
Rated exhaust steam pressure Mpa 0.007
Rated steam consumption kg/kw.h 6.76
Max component weight ton ~30
Dimension meter 7.505*4.97*2.84
OEM service is available. According to customers's parameter requirement, we can customized R&D,produce and supply steam turbines


Other models of extraction condensing steam turbines

model Power(MW) Steam inlet parameters Pumping      parameters Steam consumption(kg/kw.h) Speed(r/min) exhaust pressure  
Pressure(Mpa) Temperature(ºC) Flow Pressure(Mpa) Flow (Mpa)  
(t/h) (t/h)    
C12-6.5/1.2 12 6.5 470 105.3 1.2 75 7.02 3000 0.007  
C15-3.43/0.98 15 3.43 435 101.5 0.98 45 6.76 3000 0.007  
C20-8.83/0.98 20 8.83 535 90 0.98 45 6 3000 0.007  
C25-3.43/0.98 25 3.43 435 101.5 0.98 45 6.76 3000 0.007  
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98


High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98

dynamo Exciter
model capacity Voltage Power Factor efficiency power Voltage
  KVA V   % KW V
QFK-3-2 3750 6300
3150
0.8 95.3 30 100
QF-3-2 3750 10500
6300
0.8 95.3 30 100
QF-6-2 7500 10500
6300
0.8 96.4 45 150
QF-7-2 8750 10500
6300
0.8 97 45 150
QF-12-2 15000 10500
6300
0.8 97 65 230
QF-15-2 18750 10500
6300
0.8 97 65 230
QF-25-2 31250 10500
6300
0.8 97.4 105 230
QF-30-2 37500 10500
6300
0.8 97.6 105 230
Product Description
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
The working principle of a extraction condensing steam
turbine
is to add the function of extraction on the basis of a
condensing steam turbine taking into account both power
generation and heating.



A extraction condensing steam turbine is an important
equipment for achieving 'energy saving and emission reduction', especially in
areas with energy shortages or high environmental protection
requirements, its 'combined heat and power' mode can
significantly improve the value of energy utilization.


High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98 1. Thermal power plant
 • In large thermal power plants, condensing steam turbines are the main power generation equipment. They form a thermal     power system together with boilers and generators.
2. Industrial waste heat recovery power generation
• Provide comprehensive energy services for industrial parks and development zones, uniformly supply electricity and steam, and optimize regional energy allocation.
3.Industrial enterprises
• Chemical, textile, papermaking, and other industries require steam for heating, reaction, and other processes.

High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98• Flow passage: Multi-stage reaction or impulse blades, the design has 2-4 more pressure stages.
• Condensing system: Surface condenser (copper or titanium tubes), ejector (maintaining vacuum), circulating water pump.
• Seal system: Prevents air leakage or steam escape, using labyrinth seal or carbon ring seal.
• Recuperative extraction: Extracting steam from different stages of the cylinder to heat the feedwater, thereby increasing the cycle efficiency.

High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98· product life: All components of the steam turbine adopt high-specification configurations to ensure safe operation of the unit. The designed service life of major components is not less than 30 years.
·Excellent hardware processing support and testing capabilities: With modern production workshops, and a complete range of testing equipment, we can guarantee the processing accuracy of various components.
·High operational flexibility: Through sliding pressure operation, it can be reduced to 20% of the rated load, adapting to the peak shaving demand of new energy power grids.

 

YTS's Technical Advantages
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98

Self-Developed High-Efficiency Steam Turbine Unit

By adopting 2-4 additional pressure stages and advanced blade,nozzle,and baffle nozzle profile designs, our turbine delivers:

• Reduced stage flow distance and lower enthalpy drop per  
  stage, significantly decreasing steam leakage.

• Enhanced its load flexibility and overload performance.

 

Advanced Design of Rotor & Blades
(1) Rotor

Significantly lower vibration and failure rates  compared to
other manufacturers

The rotor is numerically controlled and finely processed to completely eliminate residual stress.

(2) Blades

Ensures reliable operation under transient conditions
• Adopts variable root diameter design, allowing steam to expand smoothly along the flow-path.
• The moving blades at all stages are straight blades,together with a T-type designed impeller.

Eliminates resonant frequencies
The top of each blade is fully equipped with a band for enhanced strength.
Minimized steam leakage for enhanced internal efficiency

The blade tip features a 2-4 labyrinth seal, effectively reducing steam leakage losses.



 
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98

Advanced Design of Steam Chamber & Cylinder
(3) Steam Chamber

Uniform thermal expasion of cylinder prevents front deformation and steam leakage
• Turbine steam chamber adopts an integrated design with an optimized spherical structure, delivering enhanced rationality and compactness. 
• The high-pressure steam inlet chamber uses graphite ring sealing for enhanced safety and reliability.

(4) Cylinder

Fast start-up with rapid warm-up
• 30% quicker start-up than conventional designs and reducing steam loss.
• Maintain free thermal expansion during startup,shutdown and load variations.
• Integrally-cast cylinder features compact dimensions,simplified structure, and minimized leakage points.

 

Patented Design & Easier Maintenance
(5) Steam Seal

Patented Steam Sealing Design
• Reverse-pressure air purge system ensures zero steam leakage during operation.
• Advanced labyrinth seal configuration cuts leakage > 50% while minimizing frictional damage.
(6) Maintenance/Servicing

• Simplified maintenance operation and minimized downtime ensure extended annual working hours.
• The forged integral rotor and full-circumference steam admission design ensure reliable operation under all specified load conditions.
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
Company Profile

Anhui Yuteshuang Energy Conservation Technology Co.,Ltd.(YTS) specilized in producing energy-saving steam turbines and optimizing thermal systems for high-consumption industries: Steel, Coking, Congeneration(CHP), Papermaking, Printing & Dyeing, Sugar, Metallurgy and Building materials, including but not limited to these indutries.

Our main business focuses on producing and optimizing the following equipment:
• R&D and manufacturing of high-efficiency and energy saving steam tubines
• Improving turbine flow-path structures to enhance power generation efficiency
• Utilizing waste heat & pressure for power generation, replacing pressure-reducing equipment
• Second-hand turbine generator sets

With a full-service team covering R&D, design,manufacturing, installation and commissioning, and after-sales maintenance,we hold 67 utility patents and 23 invention patents. Our turbines outperform other suppliers by 7%-40% in efficiency. Our core technologies and cases are featured in China's MIIT Industrial Energy-saving Technology Catalog and Guidelines, and we are a company designated by the state to provide energy-saving diagnosis services.
 
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98

High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98

Power generation equipment; turbine power generator High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98

High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98
High Efficiency 15MW Extraction Condensing Steam Turbine for Coking Industry C15-3.43/0.98

 

FAQ

1. Q: How to determine the parameters of the steam turbine and get custom service?
 A: Our technical team will help to find a suitable steam turbine solution according to your current technical requirements and energy-saving target. Customized equipment will be manufactured and tested in our factory before shipment.

2. Q: Will installation services be provided?
A: Yes. We will dispatch our technical team to your site for installation and debugging upon equipment arrival.

3. Q: Can I expect to easily access after-sales support when needed?
A: Rest assured. Our technical team provides dual-channel support(online/onsite) to resolve all potential issues. When necessary, we will promptly dispatch engineers to your site for installation and maintenance.

4. Q: Does your company welcome on-site visits?
A: Yes. We warmly welcome scheduled facility visits and will arrange every details for our meeting.

5. Q: Do you offer second-hand equipment?
A: Yes. You may browse our second-hand equipment category in the product section. Inquiries for technical details are welcome.

6. Q: Packaging Specifications
A: Seaworthy package. Standard packaging uses stretch film. Also provide custom wooden cases for specialized equipment or upon request.

Condensing steam turbine generator unit for power plant

Send your message to this supplier